- [X] Assembly:
- [X] Dry fit components (clean/sand/tape/powder as necessary):
- [X] Nose cone / upper airframe
- [X] Upper airframe / booster
- [X] 98mm/64mm motor mount adapter
- [X] M motor, including vent tube alignment
- [X] Electronics bay:
- [X] Ensure G-Wiz MC is pointing up
- [X] Check altimeter wiring continuity:
- [X] G-Wiz MC:
- [X] JP3-1 (pyro +): JP3-10 (shunt)
- [X] JP3-2 (pyro -): n/a
- [X] JP3-3 (cluster/stage +): n/a
- [X] JP3-4 (cluster/stage -): n/a
- [X] JP3-5 (apogee +): primary drogue
- [X] JP3-6 (apogee -): primary drogue
- [X] JP3-7 (low alt +): backup main
- [X] JP3-8 (low alt -): backup main
- [X] JP3-9 (comp -): switched ground
- [X] JP3-10 (comp +): MC battery +
- [X] RRC2X-40K:
- [X] J1-1: backup drogue
- [X] J1-2: backup drogue
- [X] J2-1: primary main
- [X] J2-2: primary main
- [X] J3-1: switched ground
- [X] J3-2: RRC2X battery +
- [X] Tug on block wires with tweezers to ensure they're seated firmly
- [X] Altimeter settings:
- [X] G-Wiz MC:
- [X] JP1 (int/ext battery): open
- [X] JP2/JP6 (pyro inhibit): open
- [X] JP4 (cluster/stage): n/a
- [X] JP5 (400/800'): shunt
- [X] JP7 (): n/a
- [X] JP8 (telemetry): n/a
- [X] RRC2X-40K:
- [X] (on/off)
- [X] SW1-1 ((2500/2000')/(1500/1000')): off
- [X] SW1-2 (redundant/dual): off
- [X] SW1-3 (+10/0 sec delay): off
- [X] SW1-4 (+15/0 sec delay): on
- [X] SW1-5 (low/hi main (SW1)): on
- [X] Arm & check altimeters (manually short brass terminals as appropriate):
- G-Wiz MC:
beep, beep-beep, beep, beep (batt OK, no cluster/stage, apogee OK, main OK)
- RRC2X-40K:
Power up: long, long, long, short, short (SW1 settings)
Continuity: short, short, short (main & drogue OK)
- [X] Power off altimeters
- [X] Insert electronics sled onto All-thread, through rail guides & into electronics bay
- [X] Tighten down electronics bay bulkheads
- [X] Ensure arming switches are accessible through altimeter port
- [X] Arm & check altimeters (manually short brass terminals as appropriate):
- G-Wiz MC:
beep, beep-beep, beep, beep (batt OK, no cluster/stage, apogee OK, main OK)
- RRC2X-40K:
Power up: long, long, long, short, short (SW1 settings)
Continuity: short, short, short (main & drogue OK)
- [X] Power off altimeters
- [X] Put on safety glasses, long sleeves, hand socks, clear area!)
- [_] Check deployment charge continuity
- [X] Attach deployment charges:
- [X] Primary drogue: 1.0 grams
- [X] Backup drogue: 1.25 grams
- [X] Primary main: 3.0 grams
- [X] Backup main: 3.75 grams
- [X] Tape over charge terminals & deployment charge holders
- [X] Arm & check altimeters (safety glasses, long sleeves, hand socks, clear area!):
- G-Wiz MC:
beep, beep-beep, beep, beep (batt OK, no cluster/stage, apogee OK, main OK)
- RRC2X-40K:
Power up: long, long, long, short, short (SW1 settings)
Continuity: short, short, short (main & drogue OK)
- [X] Power off altimeters
- [X] Attach harnesses to electronics bay:
- [X] 25' 1/2" kevlar to drogue using QuickLink
- [X] 25' 1/2" kevlar to main using QuickLink
- [X] Insert & align electronics bay into upper airframe from nose cone side until it hits the ebay stops (safety glasses, long sleeves, hand socks, clear area!)
- [X] Capture electronics bay in upper airframe with 6 ea 8-32 x 3/4" screws
- [X] Arm & check altimeters (safety glasses, clear area!):
- G-Wiz MC:
beep, beep-beep, beep, beep (batt OK, no cluster/stage, apogee OK, main OK)
- RRC2X-40K:
Power up: long, long, long, short, short (SW1 settings)
Continuity: short, short, short (main & drogue OK)
- [X] Power off altimeters
- [X] Attach 15' 1/2" kevlar harness to booster using QuickLink
- [X] Powder booster coupler & inside upper airframe
- [X] Pack drogue parachute:
- [X] Fold parachute
- [X] Attach booster harness, drogue ebay harness, parachute, nomex with QuickLink
- [X] Burrito wrap & tape drogue chute assembly
- [_] Insert drogue chute assembly into booster side of upper airframe
- [X] Join upper & lower airframe
- [X] Fasten upper & lower airframe with 3 ea 2-56 X 1" nylon shear pins
- [X] Insert 98mm/64mm motor adapter into 98mm motor mount
- [X] Assemble Ratt M900
- [X] Insert motor:
- [X] Slide motor into 98mm/64mm MMA
- [X] Line up motor vent with airframe vent hole
- [X] Insert vent tube
- [X] Place stainless motor retaining plate
- [X] Fasten with 3 ea 10-24 x 2.5" stainless screws
- [X] Arm tracking device, insert & secure in tracking bay
- [X] Attach 15' 1/2" kevlar harness to nosecone using QuickLink
- [X] Powder nose cone shoulder & inside upper airframe
- [X] Pack main parachute:
- [X] Fold parachute
- [X] Attach nose cone harness, main ebay harness, parachute, nomex with QuickLink
- [X] Burrito wrap & tape main chute assembly
- [X] Insert main chute assembly into nose cone side of upper airframe
- [X] Insert nose cone
- [X] Fasten nose cone to upper airframe with 3 ea 2-56 X 1" nylon shear pins
- [X] Arm & check altimeters (safety glasses, clear area!):
- G-Wiz MC:
beep, beep-beep, beep, beep (batt OK, no cluster/stage, apogee OK, main OK)
- RRC2X-40K:
Power up: long, long, long, short, short (SW1 settings)
Continuity: short, short, short (main & drogue OK)
- [X] Power off altimeters
- [X] Launch prep:
- [X] RSO:
- [X] Flight card
- [X] LCO notification
- [X] RSO signature
- [X] GSE:
- [X] Set up Pratt RTLS, nitrous tank, manifold, fill line
- [X] Check Pratt RTLS fill, dump, continuity, fire
- [X] Turn Pratt RTLS off
- [X] 40 lb pad with 10' rail @ 500'
- [X] Rail stop
- [X] 8' Ladder
- [X] Launch conditions:
- [X] Nitrous between 700-800 psi
- [X] Wind speed less than 8-10 mph
- [X] Ceiling above 12,000'
- [X] Pad anchored
- [X] Launch angle
- [X] Transport rocket to pad
- [X] Breathe
- [X] Load rocket onto pad:
- [_] Adjust rail stop
- [X] Unlock & lower pad rail
- [X] Place rocket onto rail down to rail stop
- [_] Secure with cam straps
- [X] Raise & lock pad rail
- [X] Attach nitrous fill line & secure to pad/rail
- [X] Attach ignition leads & secure to pad/rail
- [_] Remove cam straps
- [X] Arm Pratt RTLS, check continuity
- [X] Turn Pratt RTLS off
- [X] Breathe
- [X] Launch:
- [X] Check FRS radio communication:
- [X] TAP coordinator
- [X] LCO
- [X] Nitrous spotters
- [X] Receive LCO permission to proceed
- [X] Clear personnel from pad area
- [X] Arm Pratt RTLS, close cover
- [X] Arm & check altimeters (ladder safety!):
- G-Wiz MC:
beep, beep-beep, beep, beep (batt OK, no cluster/stage, apogee OK, main OK)
- RRC2X-40K:
Power up: long, long, long, short, short (SW1 settings)
Continuity: short, short, short (main & drogue OK)
- [X] Leave nitrous spotter by pad
- [X] Retreat with list checker to launch head
- [X] Breathe
- [X] Receive LCO permission to launch
- [X] 5 sec pulse on nitrous fill
- [X] Verify fill solenoid engaged & vent is hissing with nitrous spotter
- [X] Nitrous spotter retreats to safe distance
- [X] Start & time fill
- [X] Breathe
- [X] Wait for nitrous spotter to verify venting liquid nitrous
- [X] Fill time: 1 minute 10 seconds
- [X] Breathe
- [X] Arm launch controller
- [X] Fire!
- [X] Launch anomalies:
- [X] No
- Yes:
- Type : ________________________________________
____________________________________________________________
- Remediation : ________________________________________
____________________________________________________________
- [X] Flight, including characteristics:
- [X] Preheater ignition : ________________________________________
____________________________________________________________
- [X] Ignition : ________________________________________
____________________________________________________________
- [X] Liftoff : ________________________________________
____________________________________________________________
- [X] Boost : ________________________________________
____________________________________________________________
- [X] Coast : ________________________________________
____________________________________________________________
- [X] Drogue deployment:
- [_] before apogee
- [_] at apogee
- [_] after apogee
- [_] didn't deploy
- [_] clean deployment
- [X] didn't see, recovered clean
- [_] problems: ________________________________________
____________________________________________________________
- [X] Check that 2 drogue charges fired
- [X] Drogue descent : fast & flopping due to last minute drogue-less choice
- [X] Main deployment:
- [_] 1000'
- [X] 800'
- [_] didn't deploy
- [_] clean deployment : ________________________________________
____________________________________________________________
- [X] problems: nose cone & its' harness executed a 1/2 overhand knot plus full twist around lower upper airframe harness; knot prevented main bundle from opening
- [X] Check that 2 main charges fired (1000'/800')
- [_] Main descent : ________________________________________
____________________________________________________________
- [X] Spot touchdown or last visible
- [X] Post Flight:
- [X] Coordinate retrieval with tracker, spotters & mule(s)
- [X] Find rocket
- [X] Check layout on ground:
- [X] All airframe pieces present
- [X] Drogue deployed
- [_] Main deployed
- [X] Motor retained
- [_] No damage
- [X] Check all 4 charges fired (safety glasses, flashlight, clear area!)
- [X] Check altimeter readings:
- [X] G-Wiz MC: 7976' (baro), 8109' (accel)
- [X] RRC2X-40K: 7997'
- [X] Pack rocket
- [X] Return to launch area
- [X] Remove & power down tracking device, return to owner
- [_] Drogue & main deployed 'as planned' for cert
- [X] Recovered within 2NM of launch for cert
- [_] TAP L3 signature
- [X] Party!
- [X] Post-post flight:
- [_] Send L3 cert form to Tripoli
- [X] Clean rocket & motor
- [X] Contact photographers & videographers
- [X] Download G-Wiz MC data
- [X] Update website with launch report
|